After the funnel configuration is complete the system will analyze your data again to determine if it matches with your indicated funnel.
Once your integration has passed the funnel analysis there is a training period of 1-2 months before your integration is added to the production model. You can enable the optimization in Ads Manager during this period, but you might not see the full performance gains until after the training period.